In Design: St Louis Road over Goose Creek Bridge Rehabilitation in Loudoun County

Cost and schedule ►

Public outreach ►

Please note: A virtual public information meeting will be held Monday, October 17, additional meeting details will be posted here in the coming weeks.  

This project will rehabilitate the St Louis Road (Route 611) bridge over Goose Creek. The bridge was originally built in 1969.

The project includes: 

  • Replacing the concrete beams with steel beams
  • Replacing the concrete deck 
  • Repairing piers

The bridge averages 3,200 vehicles a day based on 2019 data.

Estimated Costs
Preliminary Engineering - $750,000
Construction - $2.9 million
Total - $3.7 million

This project is financed with federal and state funding, including State of Good Repair funds used for bridges.

Benefits 

This project aims to improve safety for drivers and extend the overall life of the bridge.

Major Milestones 

Virtual Public Information Meeting - Late 2022
Begin Construction - Early 2024

Resources

Contact Info:

Vicente Valeza, Jr., P.E.
Structure & Bridge
703-259-3256

Kimberly McCool, P.E.
Preliminary Engineering
703-259-3220

Major funding source: State of Good Repair

Phase: In Design

UPC: 118787

State ID: 0611-053-230, B606, P101

Federal ID: STP-5B01 (206)

Lat/Long: 38.986828, -77.795463

Locality: Loudoun

Page last modified: Sept. 21, 2022