In Design: Piggott Bottom Road over Branch of Catoctin Creek Bridge Replacement in Loudoun County

Cost and schedule ►

Public outreach ►

This project will replace the Piggott Bottom Road (Route 711) bridge over Branch of Catoctin Creek. The original bridge was built in 1932 and rehabilitated in 1992, with several repairs made since. The proposed bridge will be slightly longer and higher to better withstand flooding, and includes precast concrete beams to reduce long-term maintenance. 

The bridge averages 140 vehicles a day based on 2019 data.

Estimated Costs
Preliminary Engineering - $500,000
Construction - $1.7 million
Total - $2.2 million

The project is financed with federal and state funding, including State of Good Repair funds used for bridges. 

Benefits 

The project aims to improve long-term safety and operations.

Major Milestones 

Virtual Public Information Meeting - April 2021
Notice of Willingness to Hold a Public Hearing - October 2021
Begin Construction - Summer 2022

Resources

Contact Info:

Dipali Patel, P.E.
Structure & Bridge
703-259-2429

Kimberly McCool, P.E.
Preliminary Engineering
703-259-3220

Project Photos

Other relevant links:

Notice of Willingness to Hold a Public Hearing - October 2021

Bridge Plans - September 2021

Roadway Plans - September 2021

Programmatic Categorical Exclusion - August 2021

Virtual Public Information Meeting Video
PresentationComment SheetNews Release
Ad and Meeting Webpage - April 2021

Major funding source: State of Good Repair

Phase: In Design

UPC: 111689

State ID: 0711-053-181, P101, B603

Federal ID: STP-BR09 (297)

Lat/Long: 39.157984, -77.655894

Locality: Loudoun

x2close
1 / 1
list of Photos
Profile view of Piggott Bottom Road bridge over Branch of Catoctin Creek
2 / 2
list of Photos
Approaching bridge along Piggott Bottom Road

Page last modified: Nov. 16, 2021