Under Construction: Route 58 widening - Phase IV Abingdon to Damascus Widening (Washington County)

Cost and schedule ►

Public outreach ►

The Route 58 widening project was awarded Fall 2021 and will move to construction in late 2021/early 2022. The project begins at 0.038-mile east of Route 708 (Bethel Road) and ends 0.278-mile east of Route 858 (Hollyfield Road). 

During the project, recreational traffic along the South Fork Holston River and the Virginia Creeper Trail will be periodically impacted during bridge construction. 

  


 

Benefits 

The project will provide a modern and safe four-lane highway between Abingdon and Damascus, a highly traveled area for recreational traffic as well as commuters.

Resources

Contact Info:

Brian Plummer, P.E.
276-696-3439

Major funding source: Federal Funds

Phase: Preliminary Engineering

UPC: 16382

State ID: 0058-095-108,P101,R201,C501,B605,B606

Lat/Long: 36.661111, -81.855000

Locality: Washington

Page last modified: Nov. 16, 2021